Jax, Me, and the Surf

Jax, Me, and the Surf

Friday, August 19, 2011

Follow Up Sump Work

I took the opportunity today to give the sump and DT a quick vacuum.  While I was at it, I drained the sump completely (as much as I could) in order to put the baffles back in place and silicon them in.

They are still drying, and I only had enough silicon to do the first two baffles.  The third should be OK, but we'll see.

I'll fill it back up tomorrow and see how it does.  Hopefully they don't collapse, otherwise I'm going to need more silicon ;)

Here are some shots from today:













No comments:

Post a Comment